I got over a cubic meter of bark delivered in the week, so we started the day by putting a breathable membrane down, so that the water can soak through the bark but wont rot it. We then moved on to insulating the shed and putting the roof tiles on. I went for tiles to match the ones on the house, so it doesnt look too out of place. Once Dad had left, i barrowed the bark from the front to the back to fill the area around the swing set.
Swing Set And Shed Progress November 2016 Breathable Membrane
Swing Set And Shed Progress November 2016 Shed Insulation
Swing Set And Shed Progress November 2016 Shed Roof Half Tiled
Swing Set And Shed Progress November 2016 1 Cubic Meter Of Bark
Swing Set And Shed Progress November 2016 Half Barked
Swing Set And Shed Progress November 2016 Swing Finished