I have spent most of my lunch breaks in the loft making slow progress on insulating the 2 ends. I framed and then insulated the feature wall, then because i am going to be adding lots of planks to the wall, i wanted more places to fix them, i decided that i would batten the wall with a center to center of 300mm, once this was done i insulated in between the battens. For the shelf end i built a similar framework and insulated the wall, there was some gaps and beams running through, so i used fire proof foam fill to close all of the gaps.