Dad and I had a goal to get the loft complete today. I started off by giving the walls a 2nd coat of paint, while Dad started building the shelves and desk. I then moved over to wiring up and fitting the speakers, TV and subwoofer before moving onto getting power into the loft. We framed the feature wall, shelf area and amp rack with wood to tie it all together which turned out great. We then fitted the gripper rods, laid the underlay and finally fitted the carpet. The finishing touch was to put in the stools for the desk and the beanbag seats for the TV space. The loft turned out even better than i thought it was going to!